Home

 
ISO 9000
General
Manufacturing
ISO 9000:2000 
New Requirements 
ISO/IEC 90003:2004
computer software
Chemicals
Manufacturers
Chemicals
Distributors
ISO/TS 16949
Auto-Parts
Manufacturers
Software Engineering
Guides, templates
Checklists for software eng. standards
 
Business Partnership 
 
Contact us

 
 
 
 

 

ANSI / UL 1998 Checklist
Software in Programmable Components
Evidence Product Checklist 
ANSI/UL 1998 - 2004 Standard for Software in Programmable Components
Revision 1 

by Stan Magee (read about the author)
 

E-Book 86 Pages
Published  October 2004
Download (PDF) 145 KB
Item No.: RCG21SEPTRCG
List Price: US $ 149.00

 
To Order
Download
SAMPLE PAGES
Description
This checklist was updated to include Revision 1 of this major software engineering document: ANSI/UL 1998 Standard for Software in Programmable Components. This standard is used by the fuel cell and medical device business community. The UL 1998 standard is focused toward application-specific, non-networked software in a programmable component embedded in a product for which a failure may result in injury to persons. In addition, ANSI/UL 1998 is a reference software standard intended to be used in conjunction with any product specific safety standards that address safety requirements for the identified programmable component and the product hardware. A general software configuration of a microprocessor based programmable component typically includes the operating system or executive software, communication software, micro-controller, input/output hardware, and any generic software libraries, database management or user interface software. The checklist provides an easy-to-use classification scheme of physical evidence comprised of policies, procedures, plans, records, documents, audits, and reviews. The checklist clarifies what is required for compliance through a product evidence list that will assist any software organization in meeting the requirements of this standard. The purchase of the checklist includes four hours of free consultation during 60 days after date of purchase, answering questions about the standard and the checklist. Using  this checklist saves time and money, and may aid in meeting certain governmental requirements. A quality product at a reasonable price! 

RCGLOBAL
Home / Quality System Tools / Publishing / Consulting / Writing-Translations / Business Partnership
Contact us:rcgroup@rcglobal.com